Amanatipowered by FCB.ai
Platform
Solutions
Commercial
Technology
Company

Amanati — powered by FCB.ai

Request a briefing

Home / Technology / Architecture

What your team needs before they will say yes.

Written for a CTO and a procurement function, not for a brochure. Where something is not built yet, it says so.

Nine layers

LayerResponsibilityStatus
Device and captureHandset telematics, location, permissions, offline fallbackPilot
Identity and consentHousehold identity, granular consent records, withdrawalPilot
Household dataMembers, vehicles, property, travel, policies, documentsPilot
ScoringDriving Score, Protection Score, confidence separationPilot
DecisioningTrigger events, renewal engine, reason codes, silence rulesIn build
BrokingQuote rail, panel, sale, issuance, adjustment, renewalIn build
FulfilmentAssistance dispatch, provider network, case managementPilot
Partner surfacesLead queues, sales desk, case oversight, configurationIn build
ReportingKPI framework, partner reporting, portfolio viewsPlanned

Integration surface

  • Quote rail. REST integration to the partner’s rating service or panel aggregator. Where no API exists, a rated-table fallback is supported for pilot only.
  • Policy issuance. Bind, document generation and delivery, with the issued policy written back to the vault.
  • Assistance dispatch. Case creation into the partner’s existing dispatch and provider network, with status callbacks.
  • Identity and SSO. Where the partner already holds the customer relationship.
  • Reporting export. Scheduled extracts against the KPI framework.

Sandbox environments with synthetic households are provided before contract for technical evaluation.

Typical integration timeline

Technical discovery and sandbox access: 2 weeks

Quote rail integration: 0–0 weeks

Dispatch integration: 0–0 weeks

Configuration, branding and content: 2–3 weeks

Timelines depend heavily on the partner’s own API maturity and are confirmed after discovery rather than promised beforehand.

Telematics

Capture is handset-based. There is no hardware dependency and no vendor lock-in at the device layer — a deliberate decision, since a telematics hardware commitment is difficult to reverse and constrains market entry economics.

Where a partner has an existing telematics programme, scores can be ingested rather than re-derived. Where it does not, the platform derives its own. In both cases the partner’s rights in the derived score are contractual and explicit.

Sandbox access before commitment.

Your engineers should evaluate the APIs before your commercial team negotiates against them.